«Universytetska» 110/10 kV substation automation PJSC «Kievenergo» was developed and implemented by our specialists.
Our specialists have accomplished the following works on the project:
• relay protection 110 kV adjustment;
• automation, relay protection and ASPECM data cabinets;
• relay protection and automation 110 kV installation and commissioning;
• substation automation installation and commissioning.
In the course of works:
• supply, installation and commissioning of 11 relay protection data cabinets, substation automation, control tap and arc-suppression coil control, electricity metering data cabinets;
• substation automation designed with connection to 81 relay protection, monitoring and control devices through IEC 61850, IEC 60870-5-101, ModBus communication protocols;
• 3,250 signals’ tested;
• 400 control commands’ tested;
• 8 process screens developed and “tied”;
• Information exchange through IEC 60870-5-104 communication protocol established with dispatchers’ center OIC of cable network “Kyivenergo, PJSC” with transmission of more than 2500 signals and 400 control commands;
• Mnemonic displays are designed in a graphical interface R-ident, developed by our specialists.
2021 Under the subcontract, our company performed the supply of equipment and commissioning works of the RZA, ACS TP of the substation and ASKOE, as well as a complex of works on the commissioning of the substation 330 kV "Tyligul" substation for the connection of the wind power station "DTEK Tyligulska wind power station"